As I sit down to write this for the Singing Wire another season on the Cumbres & Toltec Scenic has come to an end. This year, even with recent snow, the fall colors were once again spectacular. The last day fall colors contrasted with the white snow that has fallen the week before, truly a sight to see. I too several opportunities this season to ride the railroad and I hope you did as well. Each trip has its own splendor; it's like being on top of the world. And wildlife is something else, have you ever seen a hear of elk crossing in front of you? Just below Cumbres Pass there must have been 75-100. For those of you who know not of what I speak, you need to take a trip on the Cumbres & Toltec Scenic Railroad and experience its beauty.

I would like to compliment the Trolley Museum and staff for an outstanding open house event this October. We must continue to present ourselves to the pubic and display our unique accomplishments. Only through this continous effort of outreach will we attract new members. I hope this was just a warm up for the big 30th coming next year.

Work on the 1889 Pullman Tourist Sleeper continues. Having taken the car down to its skeletal frame we have been making many repairs. On the upper side all carlines on the clerestory were replaced due to rot on the side overhangs.  Several of the lower roof Rafters on the sides were also replaced where cracked or split. The Carlines nad Rafters are of red oak and where exposed to the exterior they are treated with wood preservative. All vertical tie rods are being replaced as severe deterioration of the rod was detected where it passes through the outside sill. A big task is underway to repolace a portion of the outside car sill. This protion of the sill was located under an ice box when the car was used in MOW service as a Kitchen Diner for the D&RG bridge crew. During construction Pullman utilized mortise and tenon joints at all junctions so we are looking forward to cutting a large number of mortises in the new sill. Since restoration of the car calls for it to be roadable, the FRA requires the installation of a continouse steel element between couplers to prevent the possibility of accordion collapse. The structural design is now under consideration and will be a big part of 2012 work schedule.

I would like to invite all Trolley Museum members to come and see our progress first hand as we continue the restoration. Also it's not too early to start planning a trip on the C&TSRR next summer. If any of you have questions about the railroad, drop by and see us, were always ready to talk about the railroad. --- John S Engs

----This article was not included in the December Singing Wire due to space and time restraints and various holiday happenings causing me to become even more disorganized than usual!!! But wanted to be sure and publish here! Hope you all enjoy and I apologize for any typos as I had to type it in from a hard copy that came snail mail! Editor - Singing Wire ---------------------------

Friday, July 1, 2011

Have a Happy and Safe Fourth! Fire Ban in Effect!!!

Happy Fourth of July Colorado Springs!!!

Email us to request the latest copy of "The Singing Wire"

The newsletter is available as a pdf and has lots of pictures to look at! And it's FREE!!!! :)

Drop by "The Barn" for a tour!!

Saturday September 17, 2011

This indeed be a day to remember for members and friends. As we celebrate Colorado Springs & Interurban Railway car #59
reaching the 50% level of restoration on its way to becoming a fully operational streetcar again. You will hear from several of
the wonderful people that have helped bring the car to this point, as well as some of the almost unbelievable stories about
the car that we have discovered as we have gone about the restoration of this one-of-a-kind car. Our Senior Restoration
Specialist will explain some of what is involved in returning a car that has been out of service for 79 years to a car that is
once again destined to do what it was built to do 110 years ago.
In addition our Birney, CS&IR #135, will be on display. The electrician responsible for the final wiring will be on hand for
Q&A.
This will be a combination of celebrating major progress on Car #59 as well as Members and Friends Day. With that in mind,
here are some of the items in store for you:
* Western BBQ Lunch will be available for purchase.
* Presentation about the Cumbres & Toltec Scenic Railway from the Colorado Springs Restoration Crew of the Denver & Rio
Grande 1889, Pullman built tourist sleeping car and a tour of their new shop area.
* Museum of the Railway Worker; see the advances in the restoration of their 1938, Southern Pacific Dining car #10400.
* New displays in the Rock Island Museum
* See new displays in the Foundation museum and upgrades in our gift shop.
* Business meeting for PPHSRF members.
This will be a day you will NOT want to miss! You will receive a flyer or email by mid-August that will give you complete
details for this event.
Chicago, Kansas, and Nebraska Railway - Steve Pelles

The Chicago, Kansas, and Nebraska Railway was formed in 1885. Marcus Low was named as its first President. The CRI&P
advanced the CK&N about 25 million dollars to begin construction in exchange for nearly all of the railroads stock. This made
the CRI&P the owners of the railroad from the very beginning. The CK&N had laid about 1388 miles of track by 1888. It was
laid mostly in Kansas and Missouri, but in 1889 CK&N failed to make its interest payment to the CRI&P and so foreclosure
proceedings began resulting in the takeover by CRI&P by June 17, 1891.
Marcus Low was hired by the Rock Island in 1873 as a lead attorney and was active in bringing about the control of the St.
Joseph and Low Railroad by the RI. Low was turned loose to extend the RI into Colorado. In the middle of 1886 Low wasted
no time grading from Elwood, Kansas in the direction of Horton, Kansas. The construction gangs, aided by the fair Kansas
weather and its ideal terrain, were caught up in a wildly enthusiastic spirit of challenge. They threw up the fill, bridged the
streams, and had things ready for the track layers over the first 43 miles.
The trackmen followed to Horton, and then went to the state capital Topeka, which was reached in 1887. From this point the
line was to go toward Hutchinson and then to Liberal, Kansas, but a change was made when a property owner by the name
of M. D. Herington talked Low into moving the line to Herington. At that time the town did not even exist, but was promised.
Herington made a deal with Low to have every concession possible and that he would receive fine treatment when he got
there. By midsummer Herington became a railroad center, and one of the biggest deviation points on the Rock Island system.
1887 saw the railroad build a line one hundred and three miles from McFarland, on the south west line, in a northwesterly
direction to Belleville, Kansas. Then from Herington to Salina 48 miles was constructed, and finally from Fairbury, Nebraska
to Nelson another stretch of 51 miles went into the records.
Roughly following the Old Chisholm Trail, the construction down into the land of the Indians across the Kansas border
progressed through the first half of the following year. Pond Creek was reached on July 15, 1888, and the grading was almost
finished beyond to Skelton and Hennessey, Kansas.
To the north a line from Horton, Kansas through Fairbury, Nebraska stretched its lonesome length to Roswell, Colorado and
southwest from Herington down through Hutchinson and Pratt.
Nothing in all railroad construction history had ever before equaled the Rock Island expansion so rapidly. The entire
mileage from Horton to Liberal was placed in service on February 26, 1888, and to Pond Creek on July 15, 1888. The first train
traversed the 564 miles from Horton to Colorado Springs on November 5, 1888. In all it had taken two years, four months, and
four days to build and put into operation one thousand one hundred and thirteen miles of railroad.
The Colorado extension had its beginning with the incorporation in Colorado of the Chicago, Rock Island and Colorado
Railroad Company on January 31, 1888. On February 15 of that year the CRI & Colorado RR entered into a contract with the
Denver and Rio Grande RR “securing full and equal use of, and joint right in, that part of the road between Denver and
Pueblo, including all main line terminals and depots.”
In another area just west of Horton, Kansas the CK&N headed southwest toward a newly proposed settlement called
Goodland. By August the construction had reached a point 60 miles west of Goodland and was pushing ahead with the
objective of reaching Colorado Springs by November 1, 1888 at a rate of two and a half miles of track laid a day.
CK&N made the crossing with the Union Pacific at an area later platted for the town of Limon Junction, 107 miles from
Goodland. Passengers wishing to go to Denver could take the supply train to Limon and transfer to the Union Pacific.
Eighteen miles northeast of Colorado Springs the CK&N crossed the Denver and New Orleans railroad at Falcon. They built
a large depot there, in their style, with a two story station.
In September of 1888, crossing under the Santa Fe line to Denver, (pillars can still be seen, but the bridge is gone), the
CK&N followed the stream west to the D&RG’s main line. On the west side of the D&RG the future town of Roswell City was
platted, but later was changed to the east side of Monument Creek. East of the main line was laid out as the yard and shops
for the Colorado Springs terminal and became known as Roswell Junction. The CK&N main line was built parallel to the dual
gauge D&RG in Colorado Springs two miles to the south.
The track layers arrived on October 10, 1888 and the connection with the Rio Grande was officially made two days later. The
first train over the line, other than the construction train, was on October 26, 1888.
Service between Chicago and Colorado was started on November 18, 1888, with the luxurious “Royal Vestibule Flyer”,
bringing an actress to Denver and Pueblo.
On July 27, 1890, the Chicago, Kansas, and Nebraska Railroad was turned over to the Chicago, Rock Island, and Pacific
Railway Company, with all railway property, rights, and franchises now under the control of the Rock Island.

Car Barn Stuff and ongoing work

A new sandblast cabinet has
greatly helped our work. It can
hold larger items, it’s
freestanding saving the
operators back, and most
importantly, it works!

Car 135 "The Birney" Work

Wayne Russert continues
working on the electrical
components for the car. He is
dedicating one day a week
doing the work in his shop at
home. He has numerous
tools there unavailable at the
barn. He’s fabricated metal
panels for the operator
controls for the lights and
indicators. They will probably
be black crackle painted to
appear as the same era as
the car. The panels will hold
controls and indicators not
originally used, such as air
brake low pressure warning
indicators, required by
modern safety requirements.
Once these are installed and
wired the next step involves
restoring the two seriesshunt
controllers and the
heavy gauge wiring
underneath the car.
When tour groups pass
through the barn the Birney
receives numerous admiring
comments. The work of Jeff,
Neil, Vince, and everybody
else on the Birney crew is
much appreciated.

CS&IR No. 59 Restoration Archeology by Greg Roberts
With warmer temperatures the work pace on ’59 picked up. Not only do some materials
require warmer temperatures, so do fingers. Structural defects in the lower frame are
being repaired one by one. Some of these have contributed to the historical record of
the car. A charred spot on the interior of one end sill was about 5 inches across and
just over half an inch deep. Located where a choke coil and the lightning arrestor were
mounted it indicates lightning gave ’59 a nasty jolt at some time. Given the
thunderstorm activity in Colorado Springs this is no surprise. Adding to this Mr.
Dodson, who purchased the car body in 1932, storing dynamite in the car during its
service as a work shed we’re lucky to still have it. Good thing lightning didn’t hit the
car with the dynamite in there!
Where one center sill and a bolster sill join, a small piece broken off of the center sill
had been nailed back into place. Since the repair was under the original flooring the
repair was done at Laclede during construction of the car. Due to some added
deterioration around the broken piece it had to be removed so a new piece of wood
can be spliced into place, called a Dutchman. Since the long sills were Long Leaf Pine
the same material will be used for the repair. The replacement pine came from a
World War II warehouse torn down in Texas over a decade ago. While paring down the
center sill spot to fit the new piece the smell of the resin in the pine wafted up.
Shavings were collected and put in a bottle. How long it will last we don’t know, but
for now we have preserved a smell the workman at Laclede who built the car would
have experienced 110 years ago.
Removing the floor revealed a nasty looking hole just over an inch in diameter passing
through a center sill at a 45 degree angle. It had been plugged with caked in mud.
Such a defect in any structural member would not pass any building or structural code.
Properly cleaned and filled with structural epoxy it will pass muster. The origin of the
hole: a knot in the timber which apparently worked its way out years ago.
The ends of the car were covered with vertical Poplar wood panels covered with heavy
gauge sheet metal. Removing the sheet metal on one end revealed faint pencil writing.
It was where some workman marked the number of the panel on the car during
construction. Although this piece can’t be reused, it will be preserved.
Some added information about the car’s future history. Uhrich Locomotive Works has
completed the replica U.S. Type 6 trolley base. Improvements to the original design
include roller bearings, grease fittings, and shunts to pass the current around the
bearings instead of through them. The base is undergoing tests for proper pressure on
the harp. A minor problem with the spring guide twisting is being resolved with an
added keyway. The base, pole, and the trucks will ship to Colorado Springs in June.



Greg Roberts

Car Barn Stuff

President's Message

President's message:
Since our March letter, some
significant events have occurred. We have
a new City Council, and our reading is that
a majority of them are sympathetic to a
revival of the bus system for two significant
reasons; the need to provide better
transportation services to the segment of
our population that is not able or willing to
drive to work and shop for various reasons,
and the expressed opinion of many firms
looking to locate here, that a vibrant public
transportation system would be a major
positive factor in their decision process.
Why is this important to our Foundation? It
is because we hope to joint venture with
Mountain Metro Transportation in the
operation of a streetcar system and that
group's sustainability is very important to
us. The Mountain Metro task force that
came up with a roadmap for their future,
gave a compelling presentation to Council
in late May, with the following
recommendations - discussed but not
voted on by Council. That their task force
reconstitute itself as an implementation
group, to further refine the specific
processes that need to occur, to make
MMT a self-sustaining operation, rather
than relying on annual appropriations from
the City's general fund. That that task force
approach the Pikes Peak Rural
Transportation Authority about putting MMT
under PPRTA and when that agency's
sales tax authority comes up for voter
renewal next year, to request a greater
share of the 1% collected be allocated to
transit operations than the 10% present
allocation.
If and when the above comes to fruition,
the bus system will be on a much stronger
footing from an operating standpoint, and
we will be dealing with the capital needs
required to put tracks in the streets,
with the associated power lines,
storage/maintenance facilities, etc.,
which it's now anticipated the City (or
PPRTA) will undertake, and that of
supplying the cars to operate, which
our Foundation expects to do. At this
point, Federal grant monies with a local
match of 20-50% will be the preferred
option for the City, and corporate or
private sponsorships for restoration of
our cars, augmented by a public fundraising
campaign will be the
Foundation's approach. Complicating
and muddying our plans for our capital
funding needs, the City's new mayor
has taken a "no new taxes" pledge and
the US Congress, led by the House of
Representatives, will probably cut
drastically, transit funding in its future
budgets. Both the Streetcar Task
Force and the Foundations are working
on these issues and I hope to have
some positive news to report in our
later editions of The Singing Wire.
Several Sad Notes:
Our long time volunteer and car
operator, Irene Bones, suffered a
debilitating stroke several weeks ago.
In Pittsburgh, during WW2, Irene was
the youngest female streetcar operator
in the nation, and we had hoped she
would be the oldest when our system
was operating here. Our prayers are
with Irene for her complete recovery.
We also note the passing of Neal
McElroth’s wife Ruth. Our prayers go
out to Neal and his family.
Dave Lippincott

Tuesday, June 21, 2011

John's History Corner

I have often pondered the lives of our city founder,
General William Jackson Palmer compared with
Winfield Scott Stratton.
They no doubt knew one another, but probably
had few words to say since their personalities and
backgrounds were quite different.
Palmer’s upbringing as a Quaker influenced his
life, but we are not aware of what, if any religion,
affected Stratton. They both called Colorado
Springs home for thirty years between 1872 and
1902 and probably came into conflict when
Stratton supposedly wanted to build his streetcar
line up Tejon Street and straight through the
Colorado College campus. There is speculation
that Palmer had Palmer Hall built to block the
route! Both men were amongst the city’s earliest
settlers and both were adventurous with vision
and tenacity – Palmer built railroads and Stratton
found gold. Whereas Palmer loved his castle,
threw parties and was comfortable with his wealth,
Stratton was uncomfortable with too much wealth
and possessions and preferred solitude over
socializing.
Both men were generous philanthropists,
particularly in giving away properties they had
acquired. Both were enamored with travel by rail,
Palmer in his railroad construction and Stratton
with his building of the Colorado Springs &
Interurban Railway and support of the Short Line
to Cripple Creek. Stratton had a weakness with
alcohol which likely contributed to his early death
in 1902 at age 54. Palmer, on the other hand, lived
to age 72 – sobriety was important to him. We
owe a great deal to both men – they made
significant contributions to our community that
will be enjoyed for many more generations!

John Haney

June NewsLetter - Singing Wire - is out! Email us to request a copy!

President's message:
Since our March letter, some
significant events have occurred. We have
a new City Council, and our reading is that
a majority of them are sympathetic to a
revival of the bus system for two significant
reasons; the need to provide better
transportation services to the segment of
our population that is not able or willing to
drive to work and shop for various reasons,
and the expressed opinion of many firms
looking to locate here, that a vibrant public
transportation system would be a major
positive factor in their decision process.
Why is this important to our Foundation? It
is because we hope to joint venture with
Mountain Metro Transportation in the
operation of a streetcar system and that
group's sustainability is very important to
us. The Mountain Metro task force that
came up with a roadmap for their future,
gave a compelling presentation to Council
in late May, with the following
recommendations - discussed but not
voted on by Council. That their task force
reconstitute itself as an implementation
group, to further refine the specific
processes that need to occur, to make
MMT a self-sustaining operation, rather
than relying on annual appropriations from
the City's general fund. That that task force
approach the Pikes Peak Rural
Transportation Authority about putting MMT
under PPRTA and when that agency's
sales tax authority comes up for voter
renewal next year, to request a greater
share of the 1% collected be allocated to
transit operations than the 10% present
allocation.
If and when the above comes to fruition,
the bus system will be on a much stronger
footing from an operating standpoint, and
we will be dealing with the capital needs
required to put tracks in the streets,
with the associated power lines,
storage/maintenance facilities, etc.,
which it's now anticipated the City (or
PPRTA) will undertake, and that of
supplying the cars to operate, which
our Foundation expects to do. At this
point, Federal grant monies with a local
match of 20-50% will be the preferred
option for the City, and corporate or
private sponsorships for restoration of
our cars, augmented by a public fundraising
campaign will be the
Foundation's approach. Complicating
and muddying our plans for our capital
funding needs, the City's new mayor
has taken a "no new taxes" pledge and
the US Congress, led by the House of
Representatives, will probably cut
drastically, transit funding in its future
budgets. Both the Streetcar Task
Force and the Foundations are working
on these issues and I hope to have
some positive news to report in our
later editions of The Singing Wire.
Several Sad Notes:
Our long time volunteer and car
operator, Irene Bones, suffered a
debilitating stroke several weeks ago.
In Pittsburgh, during WW2, Irene was
the youngest female streetcar operator
in the nation, and we had hoped she
would be the oldest when our system
was operating here. Our prayers are
with Irene for her complete recovery.
We also note the passing of Neal
McElroth’s wife Ruth. Our prayers go
out to Neal and his family.
Dave Lippincott

Saturday, April 23, 2011

Pikes Peak Trolleys, Yes! Past, Present and Future!

1.  "Pikes Peak Trolleys, Yes!  Past, Present and Future"
When:  Saturday, May 7, 2011, 1:30 p.m.
Where:  Trolley Museum, 2333 Steel Dr. (accessible from I-25:  take Fillmore east, turn south on Steel Dr. and go to end of street)
Description:  This PowerPoint presentation and tour, hosted by the Pikes Peak Historical Street Railway Foundation (PPHSRF), will show the importance of streetcars in the Pikes Peak area.
Presenter:  John Haney, historian, PPHSRF     

Wednesday, March 23, 2011

HELP WANTED

As an all volunteer organization, our ability to survive and prosper is totally dependant on attracting new memberships and new volunteers to donate their time and talents to do the many jobs we have.  On the last page of this newsletter is a membership/volunteer application form you can mail, fax or scan and email to us at csstreetcarfdn@aol.com.   Be sure not to include personal information such as credit card numbers if you use email to contact us, as email is not totally secure.

We need a Chief Executive Officer whose primary job would be recruiting members and fundraising for  the everyday operations of the foundation - raising capital for restoration of our cars and construction of the in-street system is separate.  This person could work part-time from home.  We are open to discussing a compensation arrangement based on performance.

Our volunteer needs include a webmaster (when we can bring the management of the website to the facility), a librarian (to maintain our library and filing system), a staff supervisor (to direct various maintenance and restoration tasks for our community service people), an events planner, a grants writer, an advertising/public relations specialist, a restoration assistant (to be trained in materials and restoration techniques for restoring and maintaining both our wooden and steel cars), as well as several tour guides and streetcar operators (who would be trained and available on specified days of the week). 

Contact me at 719-330-4746 or email me at csstreetcarfdn@aol.com with your interests and we'll arrange a meeting.  Dave Lippincott

March Singing Wire NewsLetter is OUT!!!

Hi Everyone! The latest news letter is out and available. Just email us if you'd like a copy sent to you!

Dear Friends and Supporters
 
In my December letter - emailed to you; if you don't recall reading it, please email me at csstreetcarfnn@aol..com and I can get you a copy - I mentioned we were moving ahead, but slowly.  That's still the case.
 
The Streetcar Task Force's next two projects will include contracts for an Alternatives Analysis, which will take the feasibility consultant's recommendations as to corridors where the system will run in its first phase, and ID specific streets, stops, car storage/maintenance facilities, and the number and types of vehicles that will be used.  It will evaluate routes for issues such as buried utilities, competing traffic, and potential for additional on-line real estate development, ridership development, tourist visitations, and the like.  Following that closely will be the environmental impact study as required by all Federally funded projects.
 
The Mountain Metro governance study and recommendations will be available for review by the new City Council and Mayor, after they take office following the elections.  At that juncture, we should have more clarity about how the proposed streetcar system will be structured and who the participants will be, and can proceed with locating appropriate funding sources and raising the required local matching monies. 
 
The Great Streets initiative involving improvements along S. Academy Blvd. has included streetcars along with bus rapid transit, as potential public transportation alternatives.  At this point, there are no funds identified for the project, but we are following the process closely to see if there are areas in which we could contribute.
 
As a non-profit foundation, we cannot support individual candidates, but I would urge our readers to evaluate for themselves, which candidates are willing to support projects of measurable benefits to our community, such as our proposed system.
 
A companion issue involves the continued availability of Federal funds, given the budget constraints being discussed in Washington at this writing.  It's clear that monies for transportation will be cut, but whether those cuts will be directed only at high-speed rail or across the spectrum is unclear.  At issue is whether we will be forced to find funds privately or through other foundations to build our system.
 
Another funding issue will have a direct and negative impact on our foundation; that of continuing funding of our 1901 LaClede streetcar restoration.  We are in the middle of completing the third of five proposed funding rounds, through the State Historical Fund, which should enable us to finish the body work on the wooden car.  (Greg Roberts has a companion article on his work on the car in this issue.)   Previously, work has been completed on frame stabilization and work on the motorized trucks, among other items. What will remain for future grants is the work on the electrical and hydraulic systems, the casting of seat frames, and some other minor issues, which are estimated to cost about $200,000., a good portion of which must be contracted out.  The State Historical Fund has notified us that the State Legislature has appropriated all the grant monies for this coming fiscal year for restoration of the Capitol dome, and in the future, cut back on grant applications from two to one per year.  Projections are that competition for SHS funds will be fierce, as a huge backlog of projects will build up. 
 
We had calculated that when completed, using all volunteer labor, the LaClede car restoration (which, until 1932, ran on the W. Colorado Avenue route), will have cost about half of the amount other streetcar restoration projects of its size and scope have cost other cities.  If any of our readers have an interest in sponsoring  the car, all or part over a three year period, to allow us to continue work on it, I would urge them to contact me at my above email address to visit with us and discuss the matter.
 
Lastly, I'd like to congratulate Greg Roberts, whose applications to the State Historical Society for state historical designations for our unrestored 1901 Brill convertible car and the almost completely restored 1919 Birney Safety Car, were approved in early February.  Hours of research about the historical nature of these cars went into the applications and the SHS committee approved both without dissent or requests for additional information.
 
Dave Lippincott

Monday, December 13, 2010

Community Service Workers

Community Service Workers
Approximately six years ago, we began researching the possibility of being involved with the Community Service Program as it then existed with the local court system in Colorado Springs.
This was for the purpose of taking on persons that had court-appointed community service hours to work off with non- profit organizations. We started this program on a small scale; it began to grow and after a short time, the operation on the court side changed drastically and a private organization - Front Range Community Service - took over the whole program. When they took over, we developed a contractual relationship with them, and have maintained that relationship.
It has been an excellent experience and one that has been of mutual benefit. We have agreed to take on many different types of offenders; however, we do not become involved with felons or sex-offenders.
In addition to receiving folks from this organization, we also have developed a relationship with Goodwill. 
This is an entirely different program, as people that go on food stamps in Colorado do so through Goodwill. Food stamps are not given away - they must be earned. The folks receiving these must put in a certain number of hours working at local non-profit companies per month - hours equal number of food stamps the folks receive. We are on Goodwill's approved list of 501©3s. Every month Goodwill sends us all the workers we can handle, and believe me, given the economic situation of the last year, there have been many. We also have recently been asked by Lutheran Family Services - which is a very large organization here in Colorado Springs that deals with people from around the world - if we would take on people from other countries for a short time and help train them until they find full time employment in the states. While they are with us, we teach them various work skills, introduce them to American customs and ways to live and adapt to the United States.
We have two additional programs - albeit smaller - that we work with from time to time. As of the end of October 2010, the number of volunteer hours that we have had with all of these programs combined this year amounted to 6241 hours. This totals 297 volunteers. Having these volunteers is a two way street. It provides labor that allows us to have work done that we could not afford to do. On the other hand, it taxes us to our limits to provide supervision, materials, and supplies to keep this number of people working and to service their needs. However, it has been a wonderful experience! As you know, we are an all-volunteer organization. As these people go through an interview process, we let them know we are all on the "same level; we are all volunteers", and we do not save our "dirty work" for our short-time volunteers. They are assigned the same jobs as our "regular" staff. Our job is to supply them with the number of hours they need to complete in a safe, clean, friendly, non-threatening work environment, and that they are subject to the same rules and privileges as our full time volunteers. One thing that we find is most remarkable is that we have - in the shop - one or two, or ten or twelve volunteers - both men and women, any color, race, or creed - all brought together for the first time. People being people, one could expect this could be a recipe for disaster. However, in the six years that we have been doing this, we have never had a problem. What we normally find in the first few minutes of working together, they find common ground, are talking and laughing, as though they'd been working together all along. We do everything we can to maintain this harmony. We have had some of these folks at the end of their community service time with us stay on and become full time volunteers. We have others that have made a point of coming back and letting us know how they are doing, or bringing their families into the museum and to just say hello. We have established some terrific relationships.
The whole program has become a very rewarding experience, and we have every intention of continuing it. We are not only working on streetcars, but are also working on people!
Howard Noble


Pikes Peak Trolley Museum Attn: Membership
P. O. Box 544
Colorado Springs CO 80901


Benefits of Membership
Semi-annual newsletter the Singing Wire. and periodic issues of Singing Wire Extra .
10% discount in the museum gift shop
Periodic notices for events of Interest Invitation to annual Members Day
Free access to museum and car barn Being part of a community-wide effort to restore street railway operation to Colorado Springs and being part of bringing a tourist attraction to the area. Successful examples include Dallas, New Orleans. San Francisco, Portland. and Tucson.
 
Our Museum, Restoration Shop. Gift Shop, and Office are located in the historic 1888 Rock Island Railroad Roundhouse. This area of Colorado Springs was once the town of Roswell, built by the Rock Island for its employees around 1888. Your visit will take you back in time, and we think •• you will find it both interesting and informative.

Friends of the Cumbres & Toltec

The local Friends group has their tent frame in place over their Denver & Rio Grande 1889, Pullman built narrow gauge sleeping car body. They’ve done a lot of cleaning in the car interior including stripping away the work car items. They have their "tent" on order and look forward to having the car fully covered. Once the fabric is in place they’ll pull off the plywood and rubber protective covers.

Museum news

Car House and Museum Displays
The interurban whistle now connects to our air compressor making sure anyone who falls asleep in the car shop does so at their peril. The Union Pacific locomotive bell donated last year serves as a backup.

Freeway Signs Put On Hold
Last year the Foundation contracted for signs on I-25 to inform the traveling public of our museum. Initially the price was the cost of the signs plus rent to the Colorado Department of Transportation (CDOT). Unfortunately due to the economy, the State decided to double the rent raising the total cost to $3,000. The Foundation Board determined the added number of people required to go through the facility to pay for the higher cost wouldn’t be likely given the current economy. This put the sign project on a long term hold, possibly permanently.

Attendance Down, Hours Up
The effects of the slowed economy have been felt in two ways. First, revenues from  attendance have declined about 30% compared to previous years. Public school tours have become non-existent.
Greg Roberts